F-HS24 Method Statement Task
File Reference : F-HS24 Method Statement Task
Date File Updated 10-07-26
File Format MS Word
No. of files 1
Category Health & Safety Form Templates
Tags: ISO 45001, 8.1, ISO 45001:2018, method statement, safe system of work, health and safety
  • £2.50

  or  

Login to Download


This form records the task description, relevant risk assessments completed, safe method of work, the PPE and the competence needed, with additional sections for material and documentation requirements. 

Effective Form Templates

This form template is supplied in fully editable MS Word format and can be easily customised and edited. The document uses pre-defined style formatting throughout, with all text in Calibri font for improved readability.
The following document labelling is included in the footer:

  • Form number and title
  • Information-classification
  • Version
  • Page number / total pages
alphaZ documents - beautifully designed, tried and tested form templates. No junk, jargon or unnecessary fields. Simple and usable form templates developed over 25 years through practical use in the real world. No AI generated nonsense here!
Further Reading
Further Reading

Further guidance on safe systems of work for tasks:

Document Preparation
Logo Update Service *

Download this form template with your company name and logo already added!
Document Preparation available with all document toolkits.

How to Download

To get access to this file please click on Add to Cart to purchase for immediate download. If you have an alphaZ Subscription just click on Download Files to view all the files available to download. This form is also included in the ISO 45001 Toolkit and every alphaZ ISO toolkit that covers health and safety, so if you need the wider set of documents for task method statements and safe systems of work, the toolkit route gives you this file plus everything else you need in one download.

Implementation Support
Need Help Implementing?

If you'd like hands-on help writing your method statements or your wider health and safety management system, our remote support services provide direct expert input from our team, by the day, by project, or on an ongoing basis.

File Formats

Task Method Statement Template

A shorter method statement for a single task, keeping the safe method of work front and centre. It links to the relevant risk assessments and safety guidance and records the PPE, supervision, competence, material and documentation needed, without the wider project detail of a full method statement.

A task method statement is the written safe system of work for a specific job, as expected under the Management of Health and Safety at Work Regulations 1999. It supports the operational control requirements of ISO 45001 and suits work that does not need a full multi-stage method statement.

Built for ISO 45001 and Task-Level Safe Working

The form supports the operational control requirements of ISO 45001 (clause 8.1):

  • A link to the relevant risk assessments, COSHH assessments and safety guidance for the task
  • The safe method of work set out clearly for the task
  • PPE and safety equipment, supervision, permits and competence requirements
  • Material and documentation requirements, with space for notes

What's Included in this Task Method Statement

The form is deliberately concise so it is quick to produce for a single job:

  • Header - prepared by, date, method statement number and a description of the task
  • Related documents - relevant risk assessments, COSHH and safety guidance
  • Safe method of work - how the task is to be carried out safely
  • Requirements - PPE and safety equipment, supervision, permits and competence, material and documentation requirements, and notes

Who Needs a Task Method Statement?

Any organisation that needs a safe system of work for a specific task without the overhead of a full project method statement - trades, maintenance, installation and service teams, and manufacturing. It supports any business working towards or maintaining ISO 45001 certification.

Pairs with the Full Method Statement

For multi-stage work use the full F-HS23 Method Statement, and for equipment see the F-HS25 Method Statement - Machine. Where the assessment and method belong together, use the F-HS29 Risk Assessment / Method Statement.

There are currently no comments for this document.

Add a Comment

Please Login or Subscribe to add Comments.