F-HS25 Method Statement Machine
File Reference : F-HS25 Method Statement Machine
Date File Updated 02-10-26
File Format MS Word
No. of files 1
Category Health & Safety Form Templates
Tags: ISO 45001, 8.1, ISO 45001:2018, method statement, machinery, PUWER, health and safety
  • £2.50

  or  

Login to Download


A method statement for safe machine use, recording machine details, relevant risk assessments, PPE/safety equipment, supervision and competency requirements, pre-start checks and safe operation information.

Effective Form Templates

This form template is supplied in fully editable MS Word format and can be easily customised and edited. The document uses pre-defined style formatting throughout, with all text in Calibri font for improved readability.
The following document labelling is included in the footer:

  • Form number and title
  • Information-classification
  • Version
  • Page number / total pages
alphaZ documents - beautifully designed, tried and tested form templates. No junk, jargon or unnecessary fields. Simple and usable form templates developed over 25 years through practical use in the real world. No AI generated nonsense here!
Further Reading
Further Reading

Further guidance on safe use of work equipment and machinery:

Document Preparation
Logo Update Service *

Download this form template with your company name and logo already added!
Document Preparation available with all document toolkits.

How to Download

To get access to this file please click on Add to Cart to purchase for immediate download. If you have an alphaZ Subscription just click on Download Files to view all the files available to download. This form is also included in the ISO 45001 Toolkit and every alphaZ ISO toolkit that covers health and safety, so if you need the wider set of documents for safe use of machinery and method statements, the toolkit route gives you this file plus everything else you need in one download.

Implementation Support
Need Help Implementing?

If you'd like hands-on help writing safe operating methods for your machinery or your wider health and safety management system, our remote support services provide direct expert input from our team, by the day, by project, or on an ongoing basis.

File Formats

Machine Method Statement Template

A method statement built around a specific machine. It links to the relevant risk assessments and safety guidance and records the PPE, supervision and competence needed, the pre-start checks and the safe operating method, so anyone using the machine works to the same safe procedure.

The Provision and Use of Work Equipment Regulations 1998 require work equipment to be used safely by trained, competent people. This machine method statement gives you a written safe operating procedure that supports the operational control requirements of ISO 45001.

Built for ISO 45001 and Safe Use of Work Equipment

The form supports the operational control requirements of ISO 45001 (clause 8.1) and PUWER:

  • A link to the relevant risk assessments and safety guidance for the machine
  • PPE and safety equipment, supervision and competence requirements
  • The pre-start checks to be completed before the machine is used
  • The safe operating method for the machine

What's Included in this Machine Method Statement

The form is set out around one machine so the safe procedure is clear and repeatable:

  • Header - the machine, prepared by, date and method statement number
  • Related documents - relevant risk assessments and safety guidance for the machine
  • Requirements - PPE and safety equipment, supervision and competence requirements
  • Pre-start checks - what to verify before the machine is started
  • Safe operation - the safe operating method for the machine

Who Needs a Machine Method Statement?

Any organisation operating machinery or powered work equipment - manufacturing, engineering, workshops, warehousing and processing. It suits businesses that want a consistent safe operating procedure per machine and any organisation working towards or maintaining ISO 45001 certification.

Pairs with the Method Statement Range

For a task rather than a machine use the F-HS24 Method Statement - Task, for multi-stage work the full F-HS23 Method Statement, and for a combined assessment and method the F-HS29 Risk Assessment / Method Statement.

There are currently no comments for this document.

Add a Comment

Please Login or Subscribe to add Comments.