RA-HS47 Kettle and Boiling Water

RA-HS47 Kettle and Boiling Water

This risk assessment covers the use of a kettle generating boiling water. It is a sample completed risk assessment based on the F-HS20 risk assessment form template. Note: This example risk asses..

RA-HS48 Microwave

RA-HS48 Microwave

This risk assessment covers the use of a microwave. It is a sample completed risk assessment based on the F-HS20 risk assessment form template. Note: This example risk assessment is supplied for ..

RA-HS49 Noise

RA-HS49 Noise

This risk assessment covers the generation of noise using equipment and appropriate controls which should be in place to protect the hearing of workers. It is a sample completed risk assessment b..

RA-HS50 Vibration

RA-HS50 Vibration

This risk assessment covers the risks and subsequent controls which should be considered and implemented with vibration. It is a sample completed risk assessment based on the F-HS20 risk assessme..

RA-HS51 Use of Paint

RA-HS51 Use of Paint

This risk assessment covers the risks and subsequent controls which should be considered and implemented when working with, using and storing paint. Paint can be considered a hazardous substance ..

RA-HS52 Transporting-Dangerous-Goods

RA-HS52 Transporting-Dangerous-Goods

This risk assessment covers the risks and subsequent controls which should be considered and implemented when transporting dangerous goods. It is a sample completed risk assessment based on the F..

RA-HS53 Farming Activities

RA-HS53 Farming Activities

This risk assessment covers the risks and subsequent controls which should be considered when on/ around a farm and farming activities. It is a sample completed risk assessment based on the F-HS2..

RA-HS54 Demolition Soft-Stripping

RA-HS54 Demolition Soft-Stripping

This risk assessment covers the risks and subsequent controls which should be considered when demolition works are being carried out for soft stripping. It is a sample completed risk assessment b..

RA-HS55 Demolition - Uncontrolled Collapse of Structure

RA-HS55 Demolition - Uncontrolled Collapse of Structure

This risk assessment covers the risks and subsequent controls which should be considered when demolition works are being carried out for the uncontrolled collapse of a structure. It is a sample c..

RA-HS56 Demolition - Trespass

RA-HS56 Demolition - Trespass

This risk assessment covers the risks and subsequent controls which should be considered when demolition works are being carried out for the control/prevention of trespassing. It is a sample comp..

RA-HS57 Demolition - Use of Excavators

RA-HS57 Demolition - Use of Excavators

This risk assessment covers the risks and subsequent controls which should be considered when demolition works are being carried out for the control/use of excavators. It is a sample completed ri..

RA-HS58 Demolition - Use of Articulated Dumpers

RA-HS58 Demolition - Use of Articulated Dumpers

This risk assessment covers the risks and subsequent controls which should be considered when demolition works are being carried out for the use of articulated dumpers. It is a sample completed r..

RA-HS59 On-Site Dumpers

RA-HS59 On-Site Dumpers

This risk assessment covers the risks and subsequent controls which should be considered when working with dumpers on-site. It is a sample completed risk assessment based on the F-HS20 risk asses..

RA-HS60 Ride-on Compactors

RA-HS60 Ride-on Compactors

This risk assessment covers the risks and subsequent controls which should be considered when working with ride-on compactors. It is a sample completed risk assessment based on the F-HS20 risk as..

RA-HS61 Heavy Plant Loading Shovels

RA-HS61 Heavy Plant Loading Shovels

This risk assessment covers the risks and subsequent controls which should be considered when working with tracked and wheeled loading ShovelsIt is a sample completed risk assessment using the F-HS20 ..

RA-HS62 Legionella Risk Assessment

RA-HS62 Legionella Risk Assessment

This risk assessment covers the risks and subsequent controls which should be considered when considering the Legionella risk within premises or with any water system.This example can be used for the ..

RA-HS63 Decommission of Existing Services

RA-HS63 Decommission of Existing Services

This risk assessment covers the risks and subsequent controls which should be considered when considering the Decommission of Existing Services on a construction site. It is a sample completed risk a..

RA-HS64 Racking

RA-HS64 Racking

This risk assessment covers the risks and subsequent controls which should be considered when using racking to store materials and cover safe storage, potential for racking collapse and racking damage..

RA-HS65 Premises - Fire Safety

RA-HS65 Premises - Fire Safety

This risk assessment covers the risks and subsequent controls which may need to be considered when reviewing Fire Safety at work premises. This may be completed in addition to a Fire Risk Assessment c..

RA-HS66 Use of Band Saw

RA-HS66 Use of Band Saw

This risk assessment covers the risks and subsequent controls which may need to be considered when reviewing the use of a Band Saw within work premises.There are a number of high-risk rated hazards in..

RA-HS67 Use of Compressed Air

RA-HS67 Use of Compressed Air

This risk assessment covers the risks and subsequent controls associated with the use of compressed air for power tools. Note: This example risk assessment is supplied for use as guidance only and sho..

RA-HS68 Pillar Drill

RA-HS68 Pillar Drill

This risk assessment covers the risks and subsequent controls associated with the use of a pillar drill. Note: This example risk assessment is supplied for use as guidance only and should be reviewed ..

RA-HS69 LPG Storage

RA-HS69 LPG Storage

This risk assessment covers the risks and subsequent controls associated with the delivery and storage of LPG cylinders. Note: This example risk assessment is supplied for use as guidance only and sho..

RA-HS70 Workplace Harassment

RA-HS70 Workplace Harassment

This risk assessment covers the risks and subsequent controls associated with the harassment in the workplace.Includes a number of activities and associated hazards;Dealing with customers / public in ..

RA-HS71 Discharging Bulk Loads

RA-HS71 Discharging Bulk Loads

This risk assessment covers the risks and subsequent controls associated with the discharge of bulk loads. Note: This example risk assessment is supplied for use as guidance only and should be reviewe..

RA-CV1 Consumer Vulnerability Risk Assessment

RA-CV1 Consumer Vulnerability Risk Assessment

This is a risk assessment template for documenting and viewing the risks and controls in place for consumer vulnerability.  This file is included in the following toolkits; ISO..

RA-HS72 Use of Roller Doors

RA-HS72 Use of Roller Doors

This risk assessment covers the risks and subsequent controls associated with the use and management of powered roller shutter doors.The Provision and Use of Work Equipment Regulations (PUWER) in the ..

Showing 649 to 675 of 853 (32 Pages)