F-Q43 Premises RWC Patrol Checklist
File Reference : F-Q43 Premises RWC Patrol Checklist
Date File Updated 28-09-2023
File Format MS Word
No. of files 1
Category Quality Form Templates
Tags: EN 1090, FPC, WQMS

  or  

Login to Download


Premises checklist that can be completed by Responsible Welding Coordinator (RWC) as part of evidence of ongoing inspection and monitoring for demonstrating compliance with CE / UKCA marking  BS EN 1090 Factory Production Control (FPC) system.

This checklist also includes a section with Health & Safety checks which can be removed if not required and then lists the various checks completed by the RWC on;

- Measuring Equipment

- Welding Consumables

- Parent Materials

- Equipment / Calibration register

- Welder qualifications

- Weld procedures

- Production checks / paperwork

- NDT testing / Inspection

The checklist is setup for these checks to be logged each month and covering 12 months and may be supported by more frequent and detailed inspections.

[Information Classification: Business Use]

There are currently no comments for this document.

Add a Comment

Please Login or Subscribe to add Comments.