Integrated Management System Manual template can be prepared for your company to cover any combination of standards and other requirements. IMS1 can be prepared to cover any combination of the fo..
Toolbox talk (prepared using F-Q7-Toolbox_Talk_Attendance) on weld inspection.Talk Description;• ISO 5817:2014 – Table 1 Limits for imperfections• OP-4-01 Factory Production Control• ..
Training talk (prepared using F-Q7-Training_Talk_Attendance) BS EN 1090 Standards.Talk Description;• This talk just lists all the key standards required for BS EN 1090 certification;• BS EN 1090..
Form that can be used for recording cutting activity as part of a Factory Production Control (FPC) system. Register allows details of mark applied to material, details about cut item and any deta..
Declaration of Performance template can be used when required to CE / UKCA mark products as part of a BS EN 1090 Factory Production Control (FPC) system.The declaration will detail all declared perfor..
Premises checklist that can be completed by Responsible Welding Coordinator (RWC) as part of evidence of ongoing inspection and monitoring for demonstrating compliance with CE / UKCA marking BS ..
Welding record for documenting all welding activity to assist with demonstrating compliance with CE / UKCA marking BS EN 1090 Factory Production Control (FPC) system.This checklist can be used t..
Supplier appraisal form which can be used for documenting review and appraisal of approved suppliers.Form details supplier, details of products / services supplied (or approved to supply) and then det..
Welder qualification register for listing all Weld Procedure Specifications (WPS's) and also detailing which welders (Name / Welder ID) are qualified for each WPS to ensure compliance with CE / UKCA m..
Register for documenting monthly checking of measuring equipment to assist with demonstrating compliance with CE / UKCA marking BS EN 1090 Factory Production Control (FPC) system.This checklist ..
Fabrication Job Card form template for logging details of a job and also to assist with demonstrating compliance with CE / UKCA marking BS EN 1090 Factory Production Control (FPC) system.This fo..
Fabrication-Production Job Card form template for logging details of a job and also to assist with demonstrating compliance with CE / UKCA marking BS EN 1090 Factory Production Control (FPC) sys..
Materials issue log for keeping record of issue of materials such as the issue of welding consumables to assist with demonstrating compliance with CE / UKCA marking BS EN 1090 Factory Production..
Operational Procedure template covering the requirements for all work and activity covered by the Construction Products regulations including Factory Production Control (FPC) to the requirements of BS..
General guidance on the visual inspection of welds.Topics include;Pre-start Inspection and TestingIn-process InspectionVisual Inspection of Completed WeldsWeld DefectsChecking Weld DimensionsWeld issu..
General guidance on the standards that must be met to attain and retain BS EN 1090 Compliance.Topics include;Execution of Steel and Aluminium StructuresQuality requirements for fusion welding of metal..
Audit checklist covering overall arrangements for Factory Production Control (FPC) system and Welding Quality Management System (WQMS) based on BS EN 1090 Compliance for CE / UKCA marking of structura..