OP-4-01 Factory Production Control – BS EN 1090
File Reference : OP-4-01 Factory Production Control – BS EN 1090
Date File Updated 04-05-22
File Format MS Word
No. of files 1
Category Procedures
Tags: EN 1090, FPC, WQMS

  or  

Login to Download


Operational Procedure template covering the requirements for all work and activity covered by the Construction Products regulations including Factory Production Control (FPC) to the requirements of BS EN 1090 Execution of steel structures and aluminium structures for the fabrication and manufacture of construction components for load bearing structures. 

This procedure also includes Welding Quality Management System (WQMS) which is in accordance with ISO 3834-3 Quality requirements for fusion welding of metallic materials.

Procedure includes;

- Management of Equipment

- Management of Consumables

- Management of Parent Materials

- Review of Contract Requirements and Technical Review

- Purchasing and Supplier Appraisal

- Welding Procedures and Welder Qualifications

- Weld Planning and Responsibilities

- Pre-Start Checks

- Control of Metal Works and Fabrication

- Welding Quality Management System

This procedure is an extension of the 4.4 control of operations procedure in the Integrated Management System IMS1 manual and can be used in conjunction with the IMS1 management system to achieve compliance with the BS EN 1090 standard for CE / UKCA marking of structural steel. 

[Information Classification: Business Use]


There are currently no comments for this document.

Add a Comment

Please Login or Subscribe to add Comments.